03 / POWER

From delivery to an operating BESS system.

Complete logistics, infrastructure, installation and coordination for battery energy storage systems.

M / L
00—26
Energy infrastructure

SCOPE

Energy infrastructure

MachLoad manages the technical sequence from delivery and unloading through positioning, infrastructure installation, connection and project handover for BESS systems.

Possible activities

  • Site logistics
  • Unloading and positioning
  • Infrastructure and installation
  • Connection and handover
Discuss the scope

DELIVERABLES

A clear next step.

01

Delivery plan

02

Installation method

03

Infrastructure sequence

04

Handover plan

PROCESS

From inputs to handover.

01

Survey

Capture dimensions, weight, access, floor conditions, timing and constraints.

02

Method

Define equipment, route, sequence and required documentation.

03

Coordination

Align transport, site, partners and the working window.

04

Execution

Work to the agreed method and control every critical step.

05

Handover

Close with a clear status, verification and next actions.

MOVE / BUILD / POWER

Have drawings? Send them.

Project inquiry