03 / POWER
From delivery to an operating BESS system.
Complete logistics, infrastructure, installation and coordination for battery energy storage systems.
M / L00—26

SCOPE
Energy infrastructure
MachLoad manages the technical sequence from delivery and unloading through positioning, infrastructure installation, connection and project handover for BESS systems.
Possible activities
- Site logistics
- Unloading and positioning
- Infrastructure and installation
- Connection and handover
DELIVERABLES
A clear next step.
Installation method
Infrastructure sequence
Handover plan
PROCESS
From inputs to handover.
Survey
Capture dimensions, weight, access, floor conditions, timing and constraints.
Method
Define equipment, route, sequence and required documentation.
Coordination
Align transport, site, partners and the working window.
Execution
Work to the agreed method and control every critical step.
Handover
Close with a clear status, verification and next actions.
MOVE / BUILD / POWER